Projects
Astro 23
Ideally located near Brussels' inner ring road, facing Henri Frick Park, Astro 23 offers a unique fusion of renovation and innovation. The former headquarters of Nagelmackers Bank will undergo transformation through a renovation project aimed at creating 7,600 sq.m. of workspace, while the adjacent plot will host the construction of 20 contemporary residential units, seamlessly integrated into a green setting.
Key principles include material reuse, a circular economy, nearly zero energy efficiency, and alignment with the EU taxonomy.
Accessibility, landscape quality, interior circulation space design, and biodiversity preservation make Astro 23 an innovative project perfectly suited to the needs of future occupants.
Permit applications have been submitted on 26 May 2023.
Sustainability and well-being: Astro 23 will be EU Taxonomy aligned and aims at BREEAM Outstanding and WELL Platinum certifications
Realex
This highly energy-performa new building is designed to the highest standards of energy efficiency, well-being, and environmental certifications, and will feature an envelope equipped with photovoltaic cells to enable local energy production.
In term of outdoor spaces, meet “Pocket Park”, nestled between Rue J. de Lalaing and Rue de la Loi which offers a refreshing retreat for relaxation and social interactions. In addition, the office building will boast a seventh-floor terrace, offering a splendid view of the European District.
The site’s direct connection to the Maelbeek multimodal transport hub places accessibility at the forefront of its design. Realex will also provide a parking facility for 220 cars, charging points for electric vehicles, as well as convenient facilities for bicycles and cargo bikes, including showers and lockers.
Realex is certified “BREEAM Outstanding” at the design stage and is aligned with EU Taxonomy. It is designed to achieve WELL Platinum, DGNB Gold, and EPC A for offices while adhering to the principles of the New European Bauhaus.
Notably, the conference center has already been sold to the European Commission, marking a significant milestone in this transformative initiative.
City Dox
Ideally located at the entrance of the City and along the banks of the Canal in Anderlecht, City Dox is a new district which gathers apartments, a rest home, retails, services to business and productive activities, and soon a school. A modern, friendly and innovative district at the foot of public transportation and cycle tracks. A green district equipped with rainwater recovery systems, innovative waste management, solar panels, secured parking places for bicycles and cargo bikes, green spaces, a vegetable garden, and a superb park.
Let's go green! The commercialisation of Park Side is in full fledge : 74 bright and luminous apartments set in the peaceful park.
Discover Park Side
Move’Hub
At the doorstep of the Thalys and Eurostar, Move'Hub is located in the heart of the capital's busiest mobility hub (TGV, trains, metros, streetcars, bicycles, cabs, public parking, STIB, De Lijn and Tec buses...). Move'Hub is ideally rooted in a sustainable and connected city.
Meet'up
Committed to creating a balanced society, Move'Hub offers unmatched accessibility and visibility, as well as a warm welcome in efficient spaces. A mixed-use complex, including housing, offices, restaurants, community facilites and retail, Move'Hub creates a new, lively, urban atmosphere.
Resilient, with a bright atrium, Move'Hub's offices allow for flexible layouts and offer a wide variety of future adaptations.
Green'up
With high environmental goals, Move'Hub aims for BREEAM Outstanding and WELL Platinum certifications, in addition to alignment with the European Taxonomy objectives. A zero fossil fuel building, Move'Hub also advocates the reuse of materials, prefabrication and modularity for a reduced carbon footprint and waste. The outdoor spaces and terraces on all floors and the creation of a common garden for the residents contribute to the well-being and the climatic effort (coolness island and biodiversity). Move'Hub contributes to the sustainable transition of the neighborhood.
Move'Hub
The place to live, work and play for a new generation of European citizens.
PROGRAM
• 79 affordable residential units, 64 of which are subsidized
• 38,000m² of offices
• 2.500m² of retail and community facilities
• 2.600 m² collective garden
• 342 bicycle parking spaces as well as EV charging stations
DELIVERY
End of 2027
NOR.Bruxsels
Due to its location, the site benefits from an unprecedented connection to the public transport hub with an integrated bus station and direct access to North Station and the metro.
The planning application was submitted in May 2022, with the permit expected in mid-2024
Sustainability and well-being: NOR.Bruxsels will be EU Taxonomy aligned and aims at obtaining the BREEAM Outstanding and WELL Gold certifications.
Beaulieu
Atenor initiates the renovation of the BEAULIEU buildings in Auderghem, marking another instance of Atenor's commitment to ESG principles. Spanning an area of 30,000 square meters, these three buildings are notably outdated.
In line with the redevelopment plan for these structures, on December 4, 2023, Atenor launched an architecture competition aimed at transforming the existing buildings into a predominantly residential mixed-use project. This new purpose aligns more closely with market expectatioThe announcement of the competition winner is anticipated on April 17, 2024.
Les Berges de l’Argentine
Nysdam Office Park
Au Fil des Grands Prés
Following the commercial success of the first phase of the residential units, the new offices premises have been acquired by major Belgian institutions: the National Employment Office, the Walloon Regional Public Transport and the Walloon-Brussels Federation.
The second phase continues with the construction of a new development (JKL) comprising 119 housing units, for which the permit was granted in December 2021, and a complex of 122 housing units (ABCD), for which the permit was obtained in December 2023. The permit for the final residential complex of 117 units (FEMI) was obtained in February 2024.
By eliminating the use of fossil fuels, units with passive heating will have a “zero carbon” rating and should all achieve an A+ EPB.
This up-and-coming district is fantastic for soft mobility thanks to the creation of pedestrian lanes as well as many secure bicycle parking spaces. It also includes water features, orchards, playgrounds and a landscaped park for the residents’ well-being.
Verheeskade I
Ideally located in the heart of the Central Innovation District in The Hague, at the crossroads between Verheeskade and Lulof streets in The Hague, the project includes the new construction of approximately 55,000 m2 of residential area (581 students flats and 471 apartments) with commercial units on the ground floor.
This entire redevelopment fits into the context of The Hague municipality's structural vision for the Central Innovation District which should be transformed into an accessible, dynamic, mix, sustainable, friendly and inclusive area.
The planning application was submitted at the end of December 2023 - planning permission is expected in Q2 2024.
Sustainability and well-being : The project will be aligned to the EU Taxonomy criteria.
Verheeskade II
The municipality of The Hague is delighted that it is finally possible to develop the entire scheme along the Verheeskade in line with its vision for the revitalisation of the Central Innovation District.
Planning permission was submitted at the end of 2023 and is expected to be granted in the 2nd quarter of 2024.
Sustainability and well-being : VERHEESKADE II will be aligned to the EU Taxonomy criteria.
Cloche d’Or
Enjoying an optimal visibility from the Boulevard Raiffeisen and close to the future tram line, this site has direct access to major roads while incorporating an exchange platform for soft mobility. The project aims to be a benchmark for an effective and fulfilling collaborative working environment for employees.
At the cutting edge of technology, the project has been designed to align with the European Taxonomy and to be fully part of the low-carbon economy by 2050.
The permit has been obtained. Construction will start immediately after the departure of Renault for a delivery in July 2027 at the latest.
Commercial success : A leasing agreement has already been signed in March 2022 with PWC for the whole campus.
Square 42
Welcome to SQUARE 42, a 20,000 m² architectural masterpiece in the heart of Belval. Developed by Atenor Luxembourg in partnership with CORES Development, SQUARE 42 sets new standards for sustainable office spaces, particularly with its innovative wooden structure.
Enjoy a meal at a premium restaurant, stay active in the fitness area, or collaborate in vibrant coworking spaces. And when you need a break, the rooftop oasis offers breathtaking views.
Sustainability and wellbeing
Square 42 is in harmony with Atenor’s policy to develop office space that meets the highest environmental and comfort standards. With its roof garden, terraces, a vast patio and green spaces and a calm atmosphere, Square 42 has been designed to offer companies and their employees far more than just offices.
The technical facilities will ensure, without the use of any fossil fuels, energy efficiency and comfort to users, in accordance with the European Taxonomy and the carbon footprint reduction objectives set by the European Commission by 2030-2050. Square 42 also aims to achieve the BREEAM Excellent and WELL Gold certifications
With the permit received, delivery is set for 2027. SQUARE 42 isn’t just a building; it’s a vision for a sustainable, thriving future.
Twist
Developed in cooperation with the firm of Steinmetzdemeyer Architectes Urbanistes, TWIST stands out for its town planning and architectural qualities and originality. It will be laid out in the form of a block with a base of retail outlets on which a mixed, 9-storey office and residential building will be erected. A garden will be landscaped on the roof of the residential building.
A real commercial success: 100% of the flats have been sold.
All the offices are leased to the Luxembourg Ministry of Finance, which has an option to buy, for the Statec. The option exercise date is 31 August 2024.
Sustainability and well-being : . TWIST aims to obtain the BREEAM “Excellent” and WELL “Platinum” certifications and will be EU Taxonomy aligned.
Kyklos
The building permit application will be submitted in June 2024
Perspectiv’
“Living: live, work, have fun”, the mixity of functions and urban planning provisions characterize this avant-garde project that combines all the benefits and conveniences of the big city with spaces for leisure and relaxation.
Com’Unity
Com'Unity offers 33,800 m² of sustainable and innovative office space, designed for the comfort and safety of employees, and a wide range of services (cafeteria, fitness room, auditorium, lounges, concierge service, etc.).
Sustainability and well-being : Com'Unity aims at obtaining BREEAM Excellent and WELL Platinum certifications
U’Man
We are exploring with the city the possibility of incorporating a change in land use into the modification of the Urban Development Plan (PLU). In this case, we would be authorized to develop housing in general. The implementation of the PLU could take place in the second quarter of 2025.
Victor Hugo 186
Located on Avenue Victor Hugo, in the 16th arrondissement, in the heart of the Central Business District of Paris, the project offers an ideal location. Companies opting for office rental within this district enjoy easy accessibility thanks to public transport as well as many amenities. Sports facilities such as Roland Garros and the Parc des Princes, the various historical sites and the presence of many shops are major attractions in the area.
The planned works include renovation that preserves the beautiful historic facade. The layout design features comfortable workspaces in a relaxed environment. The building permit was filed on 22 December 2022. A BEFA (off-plan lease) was signed for the entire surface area on 23 December 2022.
Targeted certifications : EU Taxonomy aligned, BREEAM Excellent, WELL Gold.
WellBe
Designed by Saraiva Associados and A2M, WellBe sets a new standard for workspace excellence surpassing NZEB (Net Zero Energy Building) standards. Aiming for WELL Platinum, the project will exemplify excellence through alignment with the EU Taxonomy, incorporating certifications such as BREEAM Excellent, ADENE A, and WiredScore Gold.
On 12 February 2024, Atenor and BESIX RED announced the sale of the WellBe project to Portugal's largest bank Caixa Geral de Depósitos (CGD). WellBe will serve as CGD's new headquarters.
Sustainability and well-being ; WELLBE is the first project in Portugal to be pre-certified by the IWBI (International WELL Building Institute). In the long term, the project should obtain the BREEAM “Excellent”, WELL “Platinum” and Passive House certifications.
Oriente
Following WELLBE, Atenor announces a second acquisition behind the Oriente station. This will involve the demolition of the Aki shop and the construction of a mixed-use building with offices (6,800 sq.m.) and commercial premises (1,800 sq.m.). The project is located in the heart of the Park of Nations, a district with modern offices, homes, a shopping centre, the Lisbon International Fair Centre, a concert hall and more. The area enjoys excellent metro, train and bus connections, both nationally and with the centre of Lisbon.
Expressing Atenor's commitment to the local community, Oriente will offer 1,600 sq.m. of landscaped outdoor spaces open to the public.
Campo Grande
Campo Grande strategically extends Lisbon's central business district, ensuring unmatched accessibility and convenience. Close to the airport, it serves as a perfect hub for international business. With proximity to public transport, the upcoming building will be adjacent to Campo Grande metro station and near a major bus terminal.
Moreover, the project is a stone's throw from Campo Novo, a new district merging residences, retail, and innovative office spaces, enhancing its urban vibrancy. Campo Grande offers spacious layouts, enabling flexible arrangements for modern business needs. The extensive outdoor spaces for recreation further contribute to the project's allure.
Pulsar
Located just steps away from the 'Heinrichstraße' metro station and the 'Mörsenboicher-Ei' intersection, Pulsar stands out as an ultra-connected hub. It transforms a once neglected area into a cutting-edge space, adorned with quality greenery. Pulsar is fully committed to sustainability by becoming a fossil fuel-free building, thanks to heat pumps and photovoltaic panels, making a significant contribution to emissions reduction.
Lakeside
Lakeside also provides a wide range of amenities, including a cafeteria, coffee corner, bicycle facilities, and electric vehicle charging stations. However, what truly sets the project apart is its surroundings: facing the lake, surrounded by greenery, and teeming with biodiversity.
LAKESIDE is now home to renowned tenants such as Polenergia Fotowoltaika, Polenergia Sprzedaż, Bonduelle Polska and Lux Med.
As of now, Lakeside is 90% leased.
University Business Center II
The design phase for a thorough renovation of the existing building is currently underway, with circularity at the heart of the project. The goal is to create a modern structure that will stand out in the market in terms of energy efficiency and new technologies.
Fort 7
Situated near Chopin Airport in Warsaw, Fort 7 enjoys excellent accessibility. Public transportation is within walking distance, and the site is also connected to the city's main roadways.
Prioritizing sustainable mobility, Fort 7 encourages low-emission transportation by incorporating charging stations for electric vehicles. Soft mobility is promoted by providing numerous bike parking spaces, including showers, changing rooms, and lockers for employees arriving by bicycle. Residents will enjoy green terraces and outdoor spaces, strengthening the connection with nature directly from their living spaces. Emphasizing biodiversity preservation, 30% of the project area is dedicated to lush vegetation.
Following the agreement with Ennismore to host Tribe, a sustainable hotel development concept, within FORT 7, the permit the permit for this part will be submitted in the first half of 2024. Tribe will undoubtedly be a unique asset to the living and working experience at Fort 7.
The building permit for the office phase was obtained in November 2023. Construction will commence in 2024.
Olympia
The first phase of Building A is already completed, and the envelope of Building B's phase is also finished. Permits for Phases C and D have been obtained, and construction is planned.
Lease agreements have been signed for Phase A with Emerson, Cargill, Heineken Hungary, Berlin Chemie Menarini Hungary, Skintim, Kulcspatikak Pharmacy, NN, VTS, and Vertiv, resulting in an occupancy rate of 34%.
BakerStreet I
BakerStreet I is fully leased to E.ON Hungária, which will establish its new headquarters there starting in the second semester of 2024.
Ideally situated in the heart of Újbuda, one of Budapest's most populous districts, the project is located in the sought-after South Buda neighborhood. This office district is particularly favored for its proximity to the city center, universities, numerous green spaces, and the Danube. Accessibility from the most popular residential areas of Buda is a key asset of this rapidly developing zone. The area is now served by the new metro line 4, as well as a newly extended tram line 1, and a nearby bus network, with quick connections to the M1 and M7 highways. The district also offers shopping centers, restaurants, cafes, sports, and leisure facilities.
Sustainability and wellbeing : the project aims at obtaining the BREEAM 'Excellent' and Access4You certifications.
BakerStreet II
The building permit was obtained on May 17, 2022.
BakerStreet II will be situated on the eastern side of BakerStreet I, benefiting from an optimal location offering superb visibility and accessibility. The project will include a four-level underground parking facility, expansive green areas within a beautifully landscaped inner garden, ground-floor retail spaces, and multiple terraces. These additions aim to create a contemporary work environment in line with EU Taxonomy criteria, adhering to the most rigorous environmental standards and ensuring utmost comfort.
Lake 11 Home&Park
Lake 11 Home&Park is Atenor first residential project in Budapest. It is located in the serene 11th district of Budapest, nestled along a picturesque lake. This development offer 897 high-quality apartments, each featuring large terraces designed to enhance thermal comfort and minimize overheating. LAKE 11 Home&Park enjoys an ideal and easily accessible location, with excellent international and local road connectivity. Strategically positioned near tram and bus stops, the site provides easy access to numerous amenities, sport infrastructures and shops
A standout feature of Lake 11 is its commitment to sustainability. The buildings are entirely fossil-free, with heating and cooling needs met by an innovative open geothermal system coupled with water heat pumps. Additionally, rainwater retention systems and green roof spaces contribute to the project's eco-friendly design.
Residents will benefit from a TAB system (Thermally Activated Building System) for efficient slab cooling and heating. The project also prioritizes low-traffic areas and promotes shared mobility options, including cars, bicycles, and pedestrian-friendly pathways, ensuring a harmonious blend of modern living and natural beauty.
Currently in the construction phase, Phase 1 comprises 265 residential units spread across four buildings, with approximately 40% already sold.
Lake 11 Home&Park is the first residential project in Budapest which will be aligned to the EU Taxonomy.
@Expo
The project is located next to the RomExpo Exhibition Park in Bucharest, soon to be connected to the new Metro Line 6, and already enjoys excellent connectivity with public transportation. Completed office buildings have been leased to renowned tenants such as Deutsche Telekom and GameLoft, with new lease agreements signed in 2023 with Securitas and Caterpillar. The occupancy rate in the first phase of the project has exceeded 60%. On August 17, 2023, Atenor announced the completion of the project's reception process, marking the conclusion of the second phase.
UP-site Bucharest
UP-site Bucharest provides a wide range of amenities: a spa with pool and fitness center, green spaces, concierge service, and relaxation areas. Everything has been designed to offer residents a balanced and tranquil lifestyle.
Sustainability : UP-site Bucharest will be aligned to the EU Taxonomy and aims at obtaining the BREEAM 'Excellent' certification
10 New Bridge Street
Named from its ideal location, 10 New Bridge Street will propose an 8-storey building with 7,200 sqm of working spaces designed and thought for the occupents' comfort and well-being.
Designed by the international architects office HOK, Fleet House will be a prime model of renovation. the project will see more than two thirds of the existing structure retained, thereby ensuring the retention of the existing embodied carbon and reducing its environment impact.
The occupants will bernefit from cycling parking, high-quality end-of-trip facilities and four external terraces – most with spectacular views of St Paul’s Cathedral. A range of new public amenities will also be created including a new pedestrian priority route connecting Bride Lane and Bridewell Place, an art wall, a new 1,300 sq ft (120 sq m) juice bar/café, double-height office lobby with green wall and plentiful natural light and a 4,000 sq ft (370 sq m) re-provided public house at ground-floor and part-basement level.
Sustainability and well-being : FLEET HOUSE aims at obtaining BREEAM “Outstanding”- and WELL “Platinum” certifications.
Westbourne Village
The site hosts the main depot for Tower Transit and RATP Dev’s West London bus operations. In a common desire to revitalise the district, the partners are going to transform this 6,000 sq.m. lot and create a unique mixed ‘city-village’ London quarter. The development is expected to provide a highly sustainable residential-led mixed-use community which will benefit from a unique canal and park-side location, as well as superb transport connections
Eoin Conroy, Country Director UK for Atenor: "As well as underlining our commitment to grow and diversify Atenor’s London development pipeline, the opportunity is very much in keeping with our approach to build strong partnerships in order to deliver highly sustainable urban regeneration projects which deliver positive social and economic impact. We very much look forward to working with and listening to the local community, Westminster Council and our project partners in the months ahead.”
Nysdam, La Hulpe
Logements - Lot JKL
Date
Start of the works : Q1 2025 - End of the works: Q1 2027
Status
In portfolio
Units
7,600 sq.m. of offices - 20 residential units - 1,500 sq.m. of green spaces - spaces for bikes and EV charging stations
Architect
SMAK Architects and Bureau Bouwtechniek
Project owner
Highline SA and Soap House SA (100% ATENOR)
Date
Start of the works: Q4 2024 - End of the works: Q1 2028
Status
In portfolio
Units
Mixed-use complex including offices (18,000 m²), conference center (26,000 m²), and retail (600 m²) - 3,400 m² of green spaces - 220 parking spaces
Architect
Assar Architectes
Project owner
Freelex SPRL & Leaselex SPRL (90% ATENOR and 10% Kingslex)
Date
Beginning of the works : 2016 - End : 2025
Status
In portfolio
Units
104,000 m2 residential - 10,176 m2 Rest Home - 17,000 m2 services to business - 9,800 m2 productive activities
Architect
JNC International (Master Plan), architectesassoc s.p.r.l. , ETAU Architects s.p.r.l. , DDS+, Stein Van Rossem, XDGA, B Architecten + Veld
Project owner
Rest Island s.a. (100% ATENOR) - Immobilière de la Petite Ile s.a. (100% ATENOR)
Date
Permit expected end 2024 - Beg. of the works : Q4 2024 - End : Q4 2027
Status
In portfolio
Units
38,000 m² offices - 79 residential units - 2.500m² of retail and community facilities
Architect
Jaspers − Eyers / B-Architecten
Project owner
Victor Estates S.A., Immoange S.A., Victor Bara S.A. & Victor Spaak S.A. (50% Atenor - 50% BPI)
Date
Beginning of the works : 2024 - End : est.2028
Status
In portfolio
Units
92,500 m² offices - 17.000 m² mobility hub, retail and equipment - 48,000 m² residential - 1,419 spaces for bicycles
Architect
Architectes Assoc+, TVK, Multiple
Project owner
ATENOR S.A., AG Real Estate
Date
N/A
Status
In portfolio
Units
N/A
Architect
N/A
Project owner
ATENOR S.A.
Date
Phase 2 - Beg. of the works : 2025 - End : 2031
Status
In portfolio
Units
4,250 m² offices - 207 residential units - 540 m² retail - 11,300 m² public green spaces - 54,365 m² natural reserve - 22,000 m² private park and gardens
Architect
MDW Architecture / Bureau Blondel / ETAU
Project owner
Atenor SA - Immobilère du Cerf
Date
End of works : 2001
Status
In portfolio
Units
15,600 m² offices
Architect
François Schillings
Project owner
Hexaten S.A. (100% ATENOR)
Date
End of works offices : Q2 2024 - Residential : ABCD : beg. Q2 208 - end : Q2 2031 - FEMI : beg. 2024 - end 2027 - JKL : TBC
Status
In portfolio
Units
614 residential units - 14.600 m² offices
Architect
Holoffe & Vermeersch / DDS & Partners / A2M - Syntaxe / Urban Platform
Project owner
Mons Properties S.A. (100% ATENOR)
Date
Beg. of the works : Q3 2024 - End : Q1 2027
Status
In portfolio
Units
581 students flats and 471 apartments - retail 1,000 m²
Architect
Vakwerk Architecten
Project owner
Verheeskade I TBMB (50% ATENOR SA)
Date
Beg. of the works : Q1 2025- End (est.) Q4 2028
Status
In portfolio
Units
1,800 residential units - 10,000 m² retail - 1,800 m² roofgardens
Architect
Vakwerk Architecten (Master Plan)
Project owner
Laakhaven Verheeskade II B.V (50% Atenor.)
Date
Beg. of works : Q3 2024 - End : Q2 2027
Status
In portfolio
Units
34,000 m² offices - 3,460 m² green spaces - 5,700 m² terraces
Architect
Moreno Architecture & Associés and A2M
Project owner
Cloche d'Or Development SA (50% Atenor - 50% Codip)
Date
Beg. of the works :Q3 2024 - End : Q2 2027
Status
In portfolio
Units
20,400 m² offices - 840 m² retail
Architect
A2M and Moreno Architecture
Project owner
SQUARE 42 SA (100% ATENOR) - Cores Development SA
Date
Beg. of works: Q2 2021 - End : Q2 2024
Status
In portfolio
Units
34 residential units - 10,100 m² offices - 735 m² retail
Architect
Steinmetzdemeyer Architectes Urbanistes
Project owner
Atenor Luxembourg (100% Atenor)
Date
Beg. Q1 2025 - End Q3 2027
Status
In portfolio
Units
7,600 sq.m. of offices and 300 sq.m. retail
Architect
HYP and UNStudio
Project owner
Square 48 SA (50% Atenor - 50 NAOS SCSp)
Date
Beg.of the works Lot 1 : Q1 2024
Status
In portfolio
Units
37,200 m² residential - 9,700 m² offices - 8,140 m² retail - 3,070 m² service activites - 8,650 m² community facilities
Architect
Wilmotte & QBuild
Project owner
ATENOR LUX SA & GETRAL SA
Date
Delivered October 2022
Status
In portfolio
Units
33,800 m² offices
Architect
SOM & SRA-Architects
Project owner
BDS une fois SAS (99% ATENOR)
Date
TBC
Status
In portfolio
Units
TBC
Architect
TBC
Project owner
Bords de Seine deux fois (100% ATENOR SA)
Date
Beg. of the works : Q1 2024 - End : Q2 2026
Status
In portfolio
Units
5,065 sq.m. office spaces - 100 sq.m. of green areas - 170 sq.m. of terraces - 22 bicycle spaces
Architect
Cabinet Bouchaud
Project owner
Atenor SA
Date
Beg. of the works Q1 2023 - End : H2 2026
Status
In portfolio
Units
28,625 m² offices - 1,240 m² retail
Architect
S+A et A2M
Project owner
ATENOR S.A. - BESIX RED
Date
Beg. of works : Q3 2024 - End Q1 2027
Status
In portfolio
Units
Offices 6,900sq.m. and retail 1,650sq.m.
Architect
Broadway Maylan
Project owner
Oriente une fois (100% Atenor)
Date
Beg. of the works : Q1 2024 - End : Q1 2027
Status
In portfolio
Units
14,100 sq.m. offices - 314 sq.m. retail
Architect
CPU
Project owner
Tage Deux Fois (100% Atenor)
Date
Beg. of the works : Q1 2023 - End : Q2 2026
Status
In portfolio
Units
14,000 m² offices
Architect
HPP Architekten
Project owner
NRW Développement SA (100% ATENOR SA)
Date
Delivered Q3 2023
Status
In portfolio
Units
23,885 sqm offices
Architect
Grupa 5
Project owner
Haverhill Investments sp z.o.o. (100% ATENOR SA)
Date
Beg. of the renovation works : 2024 - End : 2025
Status
In portfolio
Units
19,000 m² offices - 1,000 m² terraces
Architect
Grupa 5
Project owner
Haverhill Investments sp z.o.o. (100% ATENOR SA)
Date
Beg. of the works : Q2 2024 - End : 2029
Status
In portfolio
Units
ca. 140,000 m², among which 42.000 m² offices/residential / retail / leisure infrastructure and a hotel (14,000 m²) / retail
Architect
JEMS Architekci
Project owner
Brookfort Investments sp.z.o.o (100% ATENOR SA)
Date
Beg. of the works : Building A 2018 - End Q2 2020 / Building B : core&shell finished Q4 2021 / Building C&D : TBC
Status
In portfolio
Units
72,000 m² offices and retail
Architect
VIKAR & LUKACS
Project owner
Hungaria Greens Kft (100% ATENOR SA)
Date
Beg. of the works : Q2 2021 - End : Q2 2024
Status
In portfolio
Units
16,185 m² offices - 456 m² retail
Architect
Artonic Design Kft.
Project owner
Szerémi Greens Kft. (100% ATENOR SA)
Date
To be confirmed
Status
In portfolio
Units
22,700 sq.m. offices - 1,700 sq.m. retail
Architect
Artonic Design
Project owner
Szerémi Greens KFT (100% Atenor)
Date
Beg. of the works : Q1 2022 - End : Q4 2027
Status
In portfolio
Units
897 apartments - 4,300 m² retail
Architect
Vikár és Lukács Architects, Demeter Design Studio & Coldefy, Artonic Design, Studio'100
Project owner
Lake Greens Ltd. (100 % Atenor)
Date
Beginning of the works : Q1 2020 - End : Q3 2023
Status
In portfolio
Units
50,721 m² offices and 4,000 m² retail
Architect
Blue Project
Project owner
NOR Real Estate srl (100% ATENOR)
Date
Beginning of the works : Q2 2021
Status
In portfolio
Units
29,300 m² residential (270 apartments) - 1,950 m² retail
Architect
Bueso-Inchausti & Rein Arquitectos
Project owner
NOR Residential SRL (100% ATENOR SA)
Date
N/A
Status
In portfolio
Units
7,200 sqm
Architect
HOK
Project owner
N/A
Date
N/A
Status
In portfolio
Units
6,000 sq.m.
Architect
N/A
Project owner
N/A
-
Astro 23
Belgium, Brussels -
Realex
Belgium, Brussels -
City Dox
Belgium, Brussels -
Move'Hub
Belgium, Brussels -
NOR.Bruxsels
Belgium, Brussels -
Beaulieu
Belgium, Brussels -
Les Berges de l'Argentine
Belgium, La Hulpe -
Nysdam Office Park
Belgium, La Hulpe -
Au Fil des Grands Prés
Belgium, Mons -
Verheeskade I
-
Verheeskade II
-
Cloche d'Or
-
Square 42
Luxembourg, Belval -
Twist
Luxembourg, Belval -
Kyklos
Luxembourg, Belval -
Perspectiv'
Luxembourg, Esch-sur-Alzette -
Com'Unity
France, Bezons -
U'Man
France, Bezons -
Victor Hugo 186
France, Paris -
WellBe
Portugal, Lisbon -
Oriente
Portugal, Lisbon -
Campo Grande
Portugal, Lisbon -
Pulsar
Germany, Düsseldorf -
Lakeside
Warsaw -
University Business Center II
Poland, Warsaw -
Fort 7
Poland, Warsaw -
Olympia
Hungary, Budapest -
BakerStreet I
Hungary, Budapest -
BakerStreet II
Hungary, Budapest -
Lake 11 Home&Park
Hungary, Budapest -
@Expo
Romania, Bucharest -
UP-site Bucharest
Romania, Bucharest -
10 New Bridge Street
United Kingdom, London -
Westbourne Village
United Kingdom, London